Answer eleven quick questions. OperatoryX builds a line-item range — equipment, cabinetry, freight — plus an outside buildout planning range, based on your real project inputs.
If you already have a dealer quote (Henry Schein, Patterson, Benco, local dealer, or other), we can prepare a planning comparison directly.
Eleven inputs. About two minutes. We'll build a live line-item range covering equipment, cabinetry, freight, and an estimated outside buildout window. Final pricing always depends on configuration, site conditions, and supplier confirmation.
Pick the closest description.
Best estimate is fine. Each additional operatory adds cost.
Enter an exact number below or pick a range. Either is enough to continue. Square footage drives the buildout side of the estimate.
— OR pick a range —
Space condition is the biggest single driver of buildout cost. A second-generation dental space costs far less to bring online than a raw shell.
Three curated package tiers. If you're not sure, choose "Not sure" — we'll default to Growth.
Cabinetry is a separate line item — not included in the equipment package. Choose "No cabinetry" for equipment-only.
Most dentists buy the equipment + cabinetry package. Equipment-only is for dentists who already have their buildout team handled.
Lets us know how to follow up with you.
Approximate is fine.
Pick a starting direction. Tap a swatch to update the preview. Final colors and finishes are confirmed before order.
Customer-friendly color names only. Selected color is saved with your estimate. Final colors and finishes are confirmed before order.
Enter your contact info to view your OperatoryX package estimate and outside buildout range.
By submitting, you agree to receive your range and follow-up communication from OperatoryX.
An early equipment, cabinetry, and logistics planning range based on your selections.
Comparable package scope (equipment + cabinetry + freight) — not a full buildout comparison. This is a planning comparison only, not a guaranteed savings claim.
Actual pricing varies by supplier, equipment selection, freight, financing, installation scope, and local requirements. This planning comparison is for equipment / cabinetry / freight scope only and does not include outside buildout.
Construction, permitting, architecture, engineering, installation labor, utility work, and final compliance review are handled separately by licensed professionals. Included for early planning only.
This is an early planning range, not a final quote. Final costs depend on site conditions, local code requirements, selected equipment, construction scope, permitting, freight, installation, and professional review.
OperatoryX prepares the conversation. Qualified professionals finalize the work. The estimator produces an early planning range — final pricing comes from your equipment professional after configuration, freight, cabinetry, and site conditions are confirmed.